Traffic Signals (TS)

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Gilbert is currently working on enhancements for several locations that require either traffic signals or street transportation safety improvements. The town regularly monitors traffic movements through its Traffic Operations Center, which includes analyzing data such as traffic volumes, crash data, and turn movements. Based on this information, traffic engineers identify specific locations that warrant improvements. In some cases, additional turn lanes or through lanes may enhance safety, while in others, a traffic signal installation may be necessary. Traffic signals are significant investments, so these projects are carefully prioritized and added to the 10-Year Capital Improvement Plan (CIP) accordingly.

Traffic Engineering Review Process

Active Traffic Signal CIP Projects

Project Hotline: 480-898-4090

Sign Up for Email Updates

WHAT TO EXPECT DURING CONSTRUCTION: 

Construction for each project is carried out independently and depends on material availability and resource scheduling. 

  1. The duration of construction varies, typically lasting two months or longer, contingent upon material availability and coordination with utilities. 
  2. Work primarily occurs during daytime hours on weekdays, with occasional weekend work if it benefits the project schedule, the traveling public, or local businesses and residents.
  3. Roads generally remain open with lane reductions and possible turn restrictions to divert traffic from the work zone.
  4. Sidewalks may be closed for ADA-related work, with signage directing pedestrians around the construction area.
  5. Access to residences and businesses will be maintained. In some cases, notifications will be sent to nearby residents or businesses, and specific coordination efforts will be made.
TS1440 Recker & Galveston
TS1460 Williams Field & Wade
TS1500 Riggs & Recker Road
TS1570 Recker & Warner
TS1920 Gilbert Road & American Heroes Way
TS1944 Higley Road & Morrison Ranch Parkway
TS1948 Val Vista Drive & Boston Street
TS1940 Fiber Optic Strategic Build Out